Renovation of Most Holy Trinity Catholic Chapel Tower
United States Military Academy, West Point, NY

CURRENT PERFORMANCE & REFERENCE SHEET

 

Project Name & Location: Renovation of Most Holy Trinity Catholic Chapel Tower
United States Military Academy, West Point, NY
Client Name & Address: USACA, U.S. Military Academy, Dir. of Contracting
Bldg. 681, USMA, West Point, NY 10996-1594
Contract Number: W911SD-07-D-0006-0002    
Date of Contract: 08/28/07 Contractual Completion: 02/15/09
Date work was started: 03/03/08 Actual Completion: 01/12/09
   
Description of Contract Work:

Work included Deconstruction and Reconstruction of the Catholic Chapel Tower including:

  • Deconstruction & salvage for reinstallation: granite and veneer stones and limestone, existing copper clad louvers, church bell, speaker platform and access hatches.
  • Removal and Disposal of: misc. exterior limestone pieces, interior brick veneer, roofing systems and temporary steel.
  • Reconstruction included: Cast-in-Place concrete frame, granite veneer, new limestone pieces to match original, tower masonry walls, reinforcement of the steeple, two new modified bitumen roofs and replacement of roof hatches.

Trades Included:

  • Masonry
  • Concrete
  • Roofing
  • Misc. Metal
  • Asbestos Abatement


Placement of Ashlar Stone at Outside Corner Limestone Restoration
    
Pointing Ashlar Stones Belfry Tower Wall
    
Coping Stone Restoration Chapel Tower

 

Home  Introduction  Government Sector   Private Sector  Government Rating  Testimonials  News Articles  Contact Us


COLLETTE CONTRACTING
PO Box 363
Pequannock, NJ 07440
Phone: 201-832-1014
Fax: 973-633-5016
E-mail: gcollette@collettecontracting.com

Copyright � 2003 Network Development Corp. All Rights Reserved.