Replace Chilled Water Coils
Keller Army Hospital
United States Military Academy, West Point, NY

CURRENT PERFORMANCE & REFERENCE SHEET

 

Project Name & Location: Replace Chilled Water Coils, Keller Army Hospital
United States Military Academy, West Point, NY
Client Name & Address: USACA, U.S. Military Academy, Dir. of Contracting
Bldg. 681, USMA, West Point, NY 10996-1594
Contract Number: W911SD-07-D-0006-0019  
Date of Contract: 05/27/09 Contractual Completion: 10/16/09
Date work was started: 08/08/09 Actual Completion: 09/17/09
Trades Included: HVAC    
Description of Contract Work:

Replacement of chilled water coils, flexible duct connector at supply filter bank in central AHU's #1, 2, 3 and 4 at Keller Army Hospital.

Installed 8 new chilled water coils, duct flex connector and replaced the flex connectors between cooling coils and fan section. Fabricated and installed new filter racks as specified in the scope of work to include new filters, fabricate and install new stainless steel drain pans as specified, remove and dispose all of the old chilled water coils, filter racks & drain pans.

All works have been accomplished within an occupied hospital fully complying with strict health and safety requirements.

 

Home/a>  Introduction  Government Sector   Private Sector  Government Rating  Testimonials  News Articles  Contact Us


COLLETTE CONTRACTING
PO Box 363
Pequannock, NJ 07440
Phone: 201-832-1014
Fax: 973-633-5016
E-mail: gcollette@collettecontracting.com

Copyright � 2003 Network Development Corp. All Rights Reserved.