Design-Build Bldg. 620, Warrior Transition Unit
United States Military Academy, West Point, NY

CURRENT PERFORMANCE & REFERENCE SHEET

 

Project Name & Location: Design-Build Bldg. 620, Warrior Transition Unit
United States Military Academy, West Point, NY
Client Name & Address: USACA, U.S. Military Academy, Dir. of Contracting
Bldg. 681, USMA, West Point, NY 10996-1594
Contract Number: W911SD-07-D-0006-0041 Contractual Completion: 02/27/2013
Date of Contract: 9/22/2011 Notice to Proceed Date: 10/12/2011
Date work was Started: 10/14/2011 Date Work Completed: 12/28/2012
   
Description of Contract Work:

Trades Included: Architectural & Engineering Design, Demolition, Concrete, Masonry, Carpentry, Doors & Windows, VCT, Carpet, Ceramic Tile, Acoustical Tile Ceiling, Fire Protection, Plumbing, HVAC, Controls, Electric, Communication, Fire Alarm, CCTV and Panic Alarm Security System.

Design-Build Contract to renovate approximately 5,000 SF on the first floor of Building 620 from its previous use as a dining facility to an administrative / office / counseling facility for the Warriors in Transition Unit (WTU) at West Point. The renovation also included some limited renovation of the basement area for storage uses.

Project Scope of Work consisted of complete architectural and engineering design; demolition and removal of all interior finishes, MEP equipment and commercial kitchen equipment; installation of new partitions, architectural finishes, doors, windows, new HVAC system; alteration of existing fire sprinkler as required; plumbing upgrades for the renovation of two bathroom to meet ADA requirements, as well as new plumbing service and fixtures to various rooms and areas; new electrical distribution panels, cable, conduit, devices for HVAC equipment, communication cables and outlets and new fire alarm system; new panic alarm system; modifications to existing doors to install security and ADA access system; interior and exterior CCTV and intercom system; civil work for handicapped access to building including restriping existing parking lot, marking spaces, new curb, new ramp and guard/handrails for the new entrance to the Warrior Transition Unit. Project was located in an occupied building also served dormitory for USMA MP�s. Therefore, all work was performed in a manner to minimize noise and dust with strict conformance with environmental protection and security plans custom tailored for the project.

 
Interior Demolition
 

Concrete Pour
 

Framing
  

Drywall
  

Before
 

After
  

 

Home/a>  Introduction  Government Sector   Private Sector  Government Rating  Testimonials  News Articles  Contact Us


COLLETTE CONTRACTING
PO Box 363
Pequannock, NJ 07440
Phone: 201-832-1014
Fax: 973-633-5016
E-mail: gcollette@collettecontracting.com

Copyright � 2003 Network Development Corp. All Rights Reserved.