Tobyhanna Fire Sprinkler Phase III Tobyhanna Army Depot, Tobyhanna, PA
PAST PERFORMANCE & REFERENCE SHEET
Project Name & Location: |
Fire Protection Phase III Tobyhanna Army Depot, Tobyhanna, PA |
Client Name & Address: |
Dept of the Army, US Army Corps of Engineers-Baltimore Dist. 10 South Howard Street, Baltimore, MD 21201 |
Contract Number: |
W912DR-04-D-0047-0003 |
Contract Duration: |
477 Days |
Date of Contract: |
11/14/06 |
Notice to Proceed Date: |
12/7/2007 |
Initial Completion Date: |
12/7/07 |
Revised Completion Date: |
3/28/08 |
|
|
|
|
Description of Contract Work: |
Fire Protection Phase III project at Tobyhanna Army Depot, Tobyhanna, PA, inclusive of:
- SiteworkConcrete
- Masonry
- Wire Mesh Enclosures
- Fire Protection
- Electrical
Modification of the existing sprinkler system in buildings 1A, 3, 4, 5, 6, 8, 10, 12 and 13 inclusive of the following:
- Demolition and existing valve pits and relocating/replacing sprinkler valve equipment.
- Excavation, trenching and backfilling for utility systems.
- Installation of new water main and dry pipe valve systems with associated support to the fire suppression system, including seismic restraints and fire department connections.
- All concrete and masonry repairs involved with demolition and new construction.
- Installation of new wire mesh partitions.
- Demolition of the existing electrical components as well as installation of the new electrical system and all supporting systems for the fire suppression system.
|
|
|
Removing ACT for new Sprinkler Pipe Installation |
Air Compressor to Maintain Air Pressure in Sprinkler System |
|
|
Utility Closet for Dry Pipe System |
New 8" Ductile Iron Elbow |
|
|
New DPV with Backflow Preventer |
New 8" Water Supply to Sprinkler System | |