Halon, HVAC and Roof Replacement, Building 2101, Spellman Hall
U.S. Military Academy, West Point, NY

PAST PERFORMANCE & REFERENCE SHEET

Project Name & Location: Halon, HVAC and Roof Replacement, Building 2101, Spellman Hall,
U.S. Military Academy, West Point, NY
Client Name & Address: Department of the Army, NY District, Corps of Engineers,
Jacob Javits Federal Building, 26 Federal Plaza, New York, NY 10278
Contract Number: DACA51-03-C-0006 Contract Duration: 335 Days
Date of Contract: 02/21/2003 Notice to Proceed Date: 03/04/2003
Initial Completion Date: 02/10/2004 Revised Completion Date: 11/12/2004
   
Description of Contract Work:
Halon, HVAC and Roof Replacement project at U.S. Military Academy, West Point, NY, inclusive of:

- Demolition (all trades)
- Structural Steel
- Acoustical ceilings
- Computer Flooring
- Fire Reporting System - Radio
- Wet Pipe Sprinkler System
- HVAC System w/ Digital Controls
- Interior & Exterior Electrical Work
- Lightning Protection

- Site & concrete works
- Roofing
- Painting
- Elevator upgrade
- Fire Detection & Alarm System - Addressable
- Cycling Preaction Sprinkler System
- Plumbing
- Diesel Generator Set and Automatic Transfer Switches
- Underground electrical distribution system

The works include providing all required civil, architectural, specialties, fire protection sprinkler system, electrical and fire detection & alarm system, plumbing works, elevator upgrade, generator, lightning protection, and underground electrical distribution system to renovate and upgrade Spellman Hall, consisting of the Academy� s computer center and office wing with five floors.

All works have been accomplished within occupied and 24/7 operational computer area, workshop area and office wing while the academy personnel were facilitating the buildings. Works have been phased in four sections to allow the installation of new HVAC, roofing sprinkler and fire alarm system and switching from existing systems without any power, HVAC and fire protection and alarm. Successful phasing and scheduling was a crucial part of the project as this building is the �brain� of the academy containing all electronic data and classified information. Collette Contracting has performed the construction operations simultaneously in all areas and phases in a very professional manner without disturbing the building occupants without a single complaint. As always, Collette has paid special attention to dust and noise protection and such operations have been performed by close coordination with Fire Department, building occupants and maintenance department. In spite of various revisions and additions, the project is currently scheduled to be completed earlier than contractual completion date.

There was no accident or loss time since the project commencement. Collette Contracting�s performance has surpassed all contract requirements and exceeded many to the government�s benefit.

Generator pad foundation & u.g. conduit
 

Generator lifting & operation
 

generator installed on pad
 

roofing works in progress
 

computer flooring prep for AC units
 

Liebert computer AC units installation
 

typical Liebert computer AC unit
 

Liebert computer AC unit piping installation
 

transfer switch pad with underground conduit
 

Home  Introduction  Government Sector   Private Sector  Government Rating  Testimonials  News Articles  Contact Us


COLLETTE CONTRACTING
PO Box 363
Pequannock, NJ 07440
Phone: 201-832-1014
Fax: 973-633-5016
E-mail: gcollette@collettecontracting.com

Copyright � 2003 Network Development Corp. All Rights Reserved.