Sanitary Sewer Lines, Laterals & Manhole Replacement Camp Buckner, West Point, NY
PAST PERFORMANCE & REFERENCE SHEET
Project Name & Location: |
Sanitary Sewer Lines, Laterals and Manhole Replacement Camp Buckner, West Point, NY |
Client Name & Address: |
Department of the Army, U.S. Military Academy, Dir. Of Contracting Bldg. 681, USMA, West Point, NY 10996-1594 |
Contract Number: |
W911SD-07-C-0007 |
|
|
Date of Contract: |
12/19/06 |
Contract Duration: |
180 Days |
Date work was started: |
10/01/07 |
Date work was completed: |
12/26/07 |
|
|
|
|
Description of Contract Work: |
Replace and reline Sanitary Sewer Lines, Laterals and Manholes including:
- Site Work
- CCTV
- Pipe Bursting
- Slip Lining
Performed CCTV of existing pipe with pipe locater and light cleaning of the 8� pressure main. Installed 8� HDEP pipe by pipe bursting method (trenchless insertion of high-density polyethylene pipe), including all fittings, fusion welding, excavation, clearing and grubbing, backfill, compaction testing and site restoration. Installed high density polyethylene pipe into existing pipe by slip-lining method, including fusion welding and grouting at pipe ends. Performed all necessary manhole repairs as well as excavation, backfilling, clearing, grubbing, compaction and site restoration. |
|