Project Name & Location: Camp Buckner Bridge Replacement and Repairs to Eight Bridges, US Military Academy, West Point, NY
Client Name & Address: Department of the Army, U.S. Military Academy, Dir. of Contracting
Bldg. 681, USMA, West Point, NY 10996-1594
Contract Number: DAAG60-00-C-0025 Date of Contract: 9/29/00
Date work was started: 4/15/01 Date work completed: 4/12/02
     
Collette Contracting Incorporated value engineered the bridge design provided by the client; and its re-design delivered a better structure, faster completion and sizable cost saving to the government Collette� s performance surpassed all contract requirements and exceeded many to the government�s benefit
Description of Contract Work:
Camp Buckner Bridge Replacement and Repairs to Eight bridges within the Military Academy and Shooting Ranges, inclusive of:

- Demolition
- River, Riverbed & Riprap Protection
- Dewatering
- Concrete & Masonry
- Rough carpentry

- Environmental Protection
- Traffic maintenance
- Asphalt paving
- Repointing existing masonry
- Timber deck & appurtenances
- Bank Restoration
- Site works & Rock excavation
- Prestressed Precast concrete units
- Steel works
- Painting

Repairs to 8 bridges within US Military Academy and Shooting Ranges include environmental protection, removing existing concrete pipes from the river, installation of riprap, cleaning and re-painting existing structural steel, installation of bearing plates and retainer clips under the bridges, installation of traffic markers & signs, timber deck removal and re-installation, repairing underside of bridge concrete superstructure, removing and replacing asphalt paving, and brick pavers, replacing & re-pointing masonry. All works are being accomplished within occupied and active roads, bridges and shooting ranges, and coordinated works in strict accordance with active US Military Academy operation and schedule without interrupting existing military and office functions.

 

New Camp Buckner Bridge under construction
 

Bridge at Range 11, Before and After
 

Bridge at Range 11, before and during construction
 

Bank Restoration, Before and After
 

Compression Washer Installment under Bridges No. 12 & 14
 

Building 667A Bridge Before and After
 

Spill protection during Bridge No. 6 Repairs
 

Underneath of Bldg 667A Bridge, Before and After
 

Underneath of Bldg 667A Bridge, Before and After
 

Home  Introduction  Government Sector   Private Sector  Government Rating  Testimonials  News Articles  Contact Us


COLLETTE CONTRACTING
PO Box 363
Pequannock, NJ 07440
Phone: 201-832-1014
Fax: 973-633-5016
E-mail: gcollette@collettecontracting.com

Copyright � 2003 Network Development Corp. All Rights Reserved.