Tobyhanna Fire Sprinkler Phase III
Tobyhanna Army Depot, Tobyhanna, PA

PAST PERFORMANCE & REFERENCE SHEET

 

Project Name & Location: Fire Protection Phase III
Tobyhanna Army Depot, Tobyhanna, PA
Client Name & Address: Dept of the Army, US Army Corps of Engineers-Baltimore Dist.
10 South Howard Street, Baltimore, MD 21201
Contract Number: W912DR-04-D-0047-0003 Contract Duration: 477 Days
Date of Contract: 11/14/06 Notice to Proceed Date: 12/7/2007
Initial Completion Date: 12/7/07 Revised Completion Date: 3/28/08
   
Description of Contract Work:

Fire Protection Phase III project at Tobyhanna Army Depot, Tobyhanna, PA, inclusive of:

  • SiteworkConcrete
  • Masonry
  • Wire Mesh Enclosures
  • Fire Protection
  • Electrical

Modification of the existing sprinkler system in buildings 1A, 3, 4, 5, 6, 8, 10, 12 and 13 inclusive of the following:

  • Demolition and existing valve pits and relocating/replacing sprinkler valve equipment.
  • Excavation, trenching and backfilling for utility systems.
  • Installation of new water main and dry pipe valve systems with associated support to the fire suppression system, including seismic restraints and fire department connections.
  • All concrete and masonry repairs involved with demolition and new construction.
  • Installation of new wire mesh partitions.
  • Demolition of the existing electrical components as well as installation of the new electrical system and all supporting systems for the fire suppression system.
Removing ACT for new Sprinkler Pipe Installation Air Compressor to Maintain
Air Pressure in Sprinkler System
Utility Closet for Dry Pipe System New 8" Ductile Iron Elbow
New DPV with Backflow Preventer New 8" Water Supply to Sprinkler System

Home  Introduction  Government Sector   Private Sector  Government Rating  Testimonials  News Articles  Contact Us


COLLETTE CONTRACTING
PO Box 363
Pequannock, NJ 07440
Phone: 201-832-1014
Fax: 973-633-5016
E-mail: gcollette@collettecontracting.com