PAST PERFORMANCE & REFERENCE SHEET
|
|
Before |
After |
Project Name & Location: |
MATOC � Arms Room Expansion, Washington Hall U. S. Military Academy, West Point, New York |
Client Name & Address: |
United States Military Academy � Directorate of Contracting SFCA-NR-WP, 681 Hardee Place, West Point, NY 10996-1514 |
Contract Number: |
W911SD-07-D-0006-0001 |
Original Completion Date: |
8/31/08 |
Date of Contract: |
12/19/07 |
Actual Completion Date: |
5/21/08 |
|
|
|
|
Description of Contract Work: |
Work includes furnishing all plant, labor, materials, supervision, and equipment; and performing all work for the Expansion of the Arms Room at Washington Hall. This work included Selective Demolition, New Security & Fire Alarm Systems, Specialty Door Hardware, Painting, Plumbing, Mechanical, Electrical and Fire Protection works.
This project was completed three months ahead of schedule! The government presented Collette Contracting Inc. with a sword from the USMA in appreciation of their efforts & a Job Well Done!
There was no accident or loss time since the project commencement.
Mechanical Work Included:
- Removal of Arms Room exhaust fan and associated ductwork
- Removal of Arms existing fan coil unit and associated branch piping
- New Arms Room exhaust fan and associated ductwork, controls, etc.
- New make-up air unit with heating and cooling capabilities.
- Removal of existing HRU unit and ductwork and installation of new split-unit A/C system and piping at the North Pantry roof.
Electrical Work:
- Selective removal of inoperative electrical system, wiring, conduits, devices and related components
- Removal of existing lighting fixtures
- Selective removal of existing security system
- New electrical panels
- New power wiring and conduit for receptacles, lights, security devices, etc.
- Power for new mechanical equipment
- New lighting fixtures including all new branch wiring, conduit, switches, etc.
- New fire alarm system and devices including all wiring, conduit, etc.
- New security devices including all wiring, conduit, etc.
Fire Protection Work:
- Removal of existing sprinklers and piping in the existing and proposed Arms Room
- Installation of new wet pipe sprinkler system designed for ordinary hazard
- Installation of new butterfly valve, tamper switch, flow switch and drain/test valve for new sprinkler system
|
|
|
New Piping & Lighting |
Completed Expanded Arms Room | |
Home Introduction Government Sector Private Sector Government Rating Testimonials News Articles Contact Us
COLLETTE CONTRACTING PO Box 363 Pequannock, NJ 07440 Phone: 201-832-1014 Fax: 973-633-5016 E-mail: gcollette@collettecontracting.com
|